An indicative answer on your part-built project, usually within 2 business days.
- An indicative assessment usually within 2 business days of the core documents, so you know where you stand before the facility expires
- Refinances from $500K to $20M, covering the payout plus the cost to complete
- Developers and builders mid-build or near completion
- Townhouses, apartments, duplexes, mixed-use and subdivision projects, most easily placed once past slab
- Lenders accepting full-doc (tax returns), low-doc or alt-doc (BAS, bank statements or an accountant's letter instead) or no-doc, depending on the project
Half-built, and the facility ends before the build does. It happens on well-run projects. A wet winter, a trade shortage or a delayed approval can push completion past the maturity date. In other cases the lender offers an extension at a higher rate, or with new conditions, or has decided to reduce its development lending. None of that has to stop the build. A development loan refinance moves the project to a new lender, pays out the existing facility and funds the remaining work through to completion. Joseph Farhat and his team can help you find a lender with appetite for a part-built project, and give you an indicative answer while there is still time on the current facility.
Who we can help access finance
- Developers with a maturity date coming up while the build still has several stages to go.
- Developers who have been offered an extension at a higher rate or with new conditions and want to compare it with a refinance.
- Builders developing their own project whose program moved after weather, a trade shortage or a council approval delay.
- Developers whose lender has reduced its development lending and will not extend past the current date.
- Developers near practical completion who need a short facility to finish the last stages and then move to a residual stock loan.
- Developers with presales in place who need a new lender to recognise those contracts.
- Self-employed developers with complex income whose project numbers are strong.
How Development Loan Refinance Works
Refinancing a partly built project is a different exercise from funding a new one. The new lender has to take on a site where some of the money has already been spent and some of the work is still to come. It needs three answers. What the project is worth today, as it stands. What it will be worth on completion. What it will cost to finish. The first two come from a valuation done on both bases. The third comes from a quantity surveyor (QS), who inspects the site, reviews the builder contract and the claims paid so far, and reports the cost to complete.
The new facility is sized to cover the payout of the existing loan, the cost to complete, capitalised interest for the rest of the build, and a contingency. The lender tests that total against the as-is and on-completion values, as a loan-to-value ratio (LVR), the loan as a share of the property's value. Where it falls short, the gap needs to be met by your own funds or by second-ranking finance such as mezzanine finance (a second loan that ranks behind the main lender). At settlement the incoming lender repays the existing facility and takes first mortgage over the site. From there, the remaining funds are released in progress draws against QS sign-off, in the same way the build was funded before.
Joseph Farhat and his team review the cost to complete, the valuations and the presale position, then take the project to the lenders among our 90+ bank, non-bank and specialist panel that fund part-built sites. Settled With Joe arranges the finance only. Presale contracts, sunset dates and the builder contract raise legal questions, so your solicitor is the right person to involve early.
What Lenders Assess for Development Loan Refinance
Cost to complete
As-is and on-completion values
Payout figure
Builder position
Presales
Approvals and insurances
Exit
The Development Loan Refinance Process: What to Expect
- Tell Joseph Farhat and his team where the build is up to, when the facility ends, what extension has been offered and what the payout looks like. You will hear honestly whether a refinance looks workable in the time available.
- In the first week, a new lender asks for the current loan statement and facility agreement, the builder contract and variations, the progress claims paid, the latest QS report, the DA and construction certificate, the presale schedule, insurance details, and your financials or bank statements.
- Once the core documents are in, we place the project with lenders that fund part-built sites, and you usually have an indicative assessment within 2 business days.
- The lender orders its own valuation and QS report, then issues an approval covering the facility limit, rate, drawdown schedule and conditions. We read through every condition with you first.
- Settlement day: the old facility is repaid and the new one takes over. Construction carries on, draws are released against QS sign-off, and at completion the loan is repaid from sales, a residual stock loan or a long-term refinance.
Indicative Finance Options
| Lender Type | Indicative Rate | Max LVR | Typical Loan Range | Loan Term | Key Consideration |
|---|---|---|---|---|---|
| Bank | Not typically offered for refinancing a part-built project. May be considered near completion with strong presales. | ||||
| Non-Bank Lenders | From ~9% p.a. | Up to 65% of on-completion value | $500K to $20M | 6 to 24 months | QS cost to complete and valuations as-is and on completion required |
| Private Finance | From ~1% per month | Up to 70% of on-completion value | $500K to $20M | 3 to 18 months | Available for unique scenarios |
Indicative figures only. Actual rates and terms depend on your project, financial position, property location, and lender assessment at the time of application. Rates are subject to change.















