Your senior development loan is approved, and there is still a gap to fund.
- Indicative assessment within 2 business days of receiving the feasibility, the senior lender's terms and the quantity surveyor (QS) report
- Mezzanine facilities from $500K to $20M, ranking behind your senior development loan
- Developers and builder-developers with an approved project and a senior lender in place or close to approval
- Covers the shortfall between the senior facility and total project cost: land, construction, fees and holding costs
- Full-doc (tax returns), low-doc or alt-doc (BAS, bank statements or an accountant's letter instead) options, with the project numbers carrying most of the weight
You have the site, the development approval (DA) and a senior lender prepared to fund most of the project. The difficulty is the part it will not fund. Many senior development lenders cap their loan at a share of total cost and of the finished value, and the developer covers the rest. When that contribution is larger than the cash and land equity you have available, mezzanine finance can close part of the difference. It is a second loan, usually secured by a second mortgage over the project site, that is repaid after the senior lender and before your own equity. Joseph Farhat and his team look at your feasibility and your senior terms together, then tell you plainly whether a mezzanine layer is workable for this project and what it is likely to involve.
Who we can help access finance
- Developers with a townhouse or apartment project whose senior approval came in at a lower limit than the feasibility assumed.
- Builder-developers who own the site but have most of their working cash committed to another project still under construction.
- Developers whose valuation returned a lower gross realisation value than expected, reducing the senior loan after the budget was set.
- Developers of mixed-use projects who have met the senior lender's presale condition but still face a shortfall at the funding stage.
- Developers part way through a build whose quantity surveyor has revised the cost to complete upward, where the senior lender is willing to consider a second-ranking loan.
- Experienced developers who would prefer a mezzanine facility to bringing in an equity partner, and want to compare the two on cost.
How Mezzanine Finance Works
A funded development is repaid in a set order. The senior loan, secured by a first mortgage, is repaid first. Mezzanine is repaid next. Your equity comes back last, along with any profit. That order is why mezzanine is called subordinated debt.
The senior lender has to be part of the arrangement. Most senior loan agreements require the senior lender's consent before any further mortgage is granted over the site, and granting one without it is usually a default under the senior loan. Once consent is given, the two lenders sign a deed of priority, also called an intercreditor deed. It is a contract between the lenders that fixes which one is repaid first, how long the mezzanine lender must wait before it can enforce, and how far the senior lender can increase its own advances ahead of the mezzanine. Your lawyer can explain how the deed affects you before anything is signed.
Being repaid second is why mezzanine costs more than the senior loan. If the finished project sells for less than planned, your equity absorbs the loss first, then the mezzanine lender, while the senior lender is paid out ahead of both. The extra interest and a second set of fees come out of the project margin, so the feasibility has to work with both loans in it. Joseph Farhat and his team test the numbers with the mezzanine cost included, find lenders among our 90+ bank, non-bank, and specialist panel who write second-ranking development debt that your senior lender will accept, and manage both sides through to settlement. We are a finance broker, not a lawyer or accountant. The deed, the guarantees and the tax position of the project stay with those professionals.
What Lenders Assess for Mezzanine Finance
Senior terms
Feasibility with both loans
Valuation
Build cost
Your contribution
Track record
Exit
The Mezzanine Finance Process: What to Expect
- Send Joseph Farhat and his team the feasibility, the senior approval or term sheet and the size of the gap. You will hear early whether a mezzanine facility suits the numbers, or whether another option looks more realistic.
- We confirm the senior lender's position on second-ranking debt, including any mezzanine lenders it has already approved, before anyone else is approached.
- Lenders that write mezzanine at your project size review the file, and you usually receive an indicative assessment within 2 business days of the core documents.
- The mezzanine lender completes its own valuation and QS review and issues terms. Lawyers for you and for both lenders settle the deed of priority.
- Both facilities settle together, draws follow the order the deed sets, and at completion the sales or refinance repay the senior loan first and the mezzanine second.
Indicative Finance Options
| Lender Type | Indicative Rate | Security Position | Typical Loan Range | Loan Term | Key Consideration |
|---|---|---|---|---|---|
| Bank | Not typically offered for mezzanine finance | ||||
| Non-Bank Lenders | Priced per project, above the senior loan rate | Second mortgage behind the senior lender | $500K to $20M | Matched to the senior facility | Senior lender consent and a deed of priority required |
| Private Finance | Priced per project, above the senior loan rate | Second mortgage, sometimes with additional security | $500K to $20M | Matched to the senior facility | Available for unique scenarios |
Indicative figures only. Actual rates and terms depend on your project, financial position, property location, and lender assessment at the time of application. Rates are subject to change.















